Climatewall Projects
Case study
UPS HUB distribution centre
Project location
Bielefeld-Sennestadt, Germany
Project start and completion
November 2019 – January 2020
Length and height
Approx. 545m long and 6m high Climatewall
Type of project
Installation of a Climatewall system consisting of Climatewall in combination with Climatewall Rock Extensive to protect against noise in the industrial area at the UPS site in Bielefeld-Sennestadt.
Duisburg 6 Lakes Wedau –
Living by the water
Project location
Duisburg-Wedau, Germany
Project start and completion
October 2020 – 2022
Length and height
Approx. 2600m long and 10m high Climatewall
Type of project
The wall was constructed to protect a nearby residential area from the noise emissions of the adjacent railway tracks while simultaneously improving the acoustic environment of the neighborhood.
Waterfront City Budapest –
Creation of a new neighbourhood
Project location
Óbuda, Budapest District III, Hungary
Project start and completion
Autumn 2021 – Autumn 2023
Length and height
Approx. 500m long and 4m high Climatewall
Type of project
Construction of a Climatewall as part of an urban development project.
New development area in Eastern Alps
Project location
Eastern Alps (North Rhine-Westphalia)
Project start and completion
September 2020 – December 2020
Length and height
Approx. 122m long and 5m and 6.7m high.
Type of project
The climatewall was installed along a residential area and an adjacent commercial yard, specifically designed to shield the community from noise generated by the nearby railway tracks.
Llucmajor, Mallorca, Spain
Project location
Llucmajor, Mallorca, Spain
Project start and completion
2021
Length and height
Approx. 50m long and 4m high Climatewall
Type of project
To specifically reduce noise pollution in the surrounding area and sustainably improve the quality of life for local residents.