Climatewall Projects

Case study

Amazon Logistics Centre Mönchengladbach

Project location
Mönchengladbach, Germany

Project start and completion
2018

Length and height
Approx. 85m long and 5m high Climatewall

Type of project
Climatewall was constructed to protect nearby residential areas from noise of the Amazon Logistics Centre.

UPS HUB distribution centre

Project location
Bielefeld-Sennestadt, Germany

Project start and completion
November 2019 – January 2020

Length and height
Approx. 545m long and 6m high Climatewall

Type of project
Installation of a Climatewall system consisting of Climatewall in combination with Climatewall Rock Extensive to protect against noise in the industrial area at the UPS site in Bielefeld-Sennestadt.

Duisburg 6 Lakes Wedau –
Living by the water

Project location
Duisburg-Wedau, Germany

Project start and completion
October 2020 – 2022

Length and height
Approx. 2600m long and 10m high Climatewall

Type of project
The wall was constructed to protect a nearby residential area from the noise emissions of the adjacent railway tracks while simultaneously improving the acoustic environment of the neighborhood.

Waterfront City Budapest –
Creation of a new neighbourhood

Project location
Óbuda, Budapest District III, Hungary

Project start and completion
Autumn 2021 – Autumn 2023

Length and height
Approx. 500m long and 4m high Climatewall

Type of project
Construction of a Climatewall as part of an urban development project.

New development area in Eastern Alps

Project location
Eastern Alps (North Rhine-Westphalia) 

Project start and completion
September 2020 – December 2020

Length and height
Approx. 122m long and 5m and 6.7m high.

Type of project
The climatewall was installed along a residential area and an adjacent commercial yard, specifically designed to shield the community from noise generated by the nearby railway tracks.

Llucmajor, Mallorca, Spain

Project location
Llucmajor, Mallorca, Spain

Project start and completion
2021

Length and height
Approx. 50m long and 4m high Climatewall

Type of project
To specifically reduce noise pollution in the surrounding area and sustainably improve the quality of life for local residents.

Climatewall in Belgium

Project location
La Louvière, Belgium, Skatepark

Project start and completion
2024

Length and height
Approx. 47m long and 2m high Climatewall

Type of project
A 47m long and 2m high Climatewall was built to protect the skatepark from the noise of the adjacent railroad tracks.