Climatewall Projects

Case study

Amazon Logistics Centre Mönchengladbach

Project Location
Mönchengladbach, Germany

Project Timeline
Completed in 2018

Dimensions
Approximately 279 feet long and 16 feet high

Project Type
The Climatewall was constructed to protect nearby residential areas from noise generated by the Amazon Logistics Center.

UPS HUB distribution centre

Project Location
Bielefeld-Sennestadt, Germany

Project Timeline
November 2019 – January 2020

Dimensions
Approximately 1788 feet long and 20 feet high

Project Type
Installation of a Climatewall system combining the Climatewall with the Climatewall Rock Extensive to provide noise protection for the industrial area at the UPS facility in Bielefeld-Sennestadt.

Duisburg 6 Lakes Wedau –
Living by the water

Project Location
Duisburg-Wedau, Germany

Project Timeline
October 2020 – 2022

Dimensions
Approximately 8530 feet long and 33 feet high

Project Type
The Climatewall was constructed to protect a nearby residential community from noise generated by the adjacent railway tracks, while also enhancing the overall acoustic environment of the neighborhood.

Waterfront City Budapest –
Creation of a new neighbourhood

Project Location
Óbuda, District III, Budapest, Hungary

Project Timeline
Fall 2021 – Fall 2023

Dimensions
Approx. 1640 feet long and 13 feet high Climatewall

Project Type
Construction of a Climatewall as part of a large-scale urban development project.

New development area in Eastern Alps

Project Location
Eastern Alps (North Rhine-Westphalia), Germany 

Project Timeline
September 2020 – December 2020

Dimensions
Approximately 400 feet long and between 16 and 22 feet high

Project Type
The climatewall was installed along a residential area and an adjacent commercial yard, specifically designed to shield the community from noise generated by the nearby railway tracks.

Llucmajor, Mallorca, Spain

Project Location
Llucmajor, Mallorca, Spain

Project Timeline
Completed in 2021

Dimensions
Approximately 164 feet long and 13 feet high

Project Type
The Climatewall was installed to reduce noise pollution in the surrounding area and sustainably enhance the quality of life for local residents.

Climatewall in Belgium

Project Location
La Louvière, Belgium (Skatepark)

Project Timeline
Completed in 2024

Dimensions
Approximately 154 feet long and 7 feet high

Project Type
A Climatewall measuring approximately 154 feet in length and 7 feet in height was installed to protect the skatepark from noise generated by the adjacent railroad tracks.